Several floods over the next 15 years caused major damage to the rails of the bridge and took months to repair on each occasion. It was not only passengers aboard trains who were affected by these long delays but various types of goods were sometimes in short supply.
Road traffic between Ayr and Home Hill was limited in the early s by the amount of water at the Bowen crossing. A low-level traffic-bridge was finally gazetted in after much pressure from Burdekin residents. The Traffic Bridge was constructed at the Bowen Crossing and although it served the district for more than 25 years it was regularly out of action because of the rising river.
The long-awaited new high-level road-rail Bridge construction was started in April During its construction local residents and tourists longed for the completion. Construction included many obstacles, the main one presented by the absence of rock in the river bed. This important program of works will see a wide variety of repairs and safeguarding works carried out on the Burdekin River Bridge, including:.
Please enable JavaScript in order to get the best experience when using this site. Burdekin River Bridge. Burdekin River Bridge at night. Burdekin River Bridge: maintenance and rehabilitation program We are undertaking the rehabilitation and maintenance program for the Burdekin River Bridge to preserve the structural integrity of the bridge. Email this page Print this page Share this page Subscribe to feeds.
0コメント